Resilient flooring is smooth, it can easily adapt to uneven terrain. Therefore, you must respect it, prepare the background well to ensure a smooth surface. sub Concrete floors must be protected from moisture. resilient flooring can be installed above or below grade floors, or wood are made with sheets of plywood or individual, or directly on an old floor. Before beginning work on the basis of preparation of the support for newPlans, the land base and support structure should be revised, is in good condition for the guarantee. And 'better, and to examine and repair minor problems in the early stages before they become problems. If you believe that the basic plan is in good condition, then you can be with your task of installing the new plan confident going long life.

And 'necessary for the concrete slab to dry, clean and level. You must make sure that the card is freefrom dirt, moisture, fat and old areas and the level of the pot, if you are installing a new floor over a concrete slab elastic, the vote or less. You must ensure that the panel is dry, because if the humidity is still off the ground, even if the plans which will be solved eventually. Most of the floors of poured concrete, which are new, even those that are expressed in moisture barrier, a decrease of at least a month to dry. If youhave facilities to heat, ventilate the word right and then the soil dry faster. But one of the drawbacks of the concrete floor is that it picks up moisture over a period of two years after installation. It would therefore be prudent to verify the presence of moisture in the soil to begin the installation process.

After securing the dryness of your concrete slab is checked for traces of oil, grease, old paint or the presence ofother foreign matter. To remove oil or grease stains with a mild floor garage parking is available in stores. To scrape off any stains or plaster or other material from the bottom of a knife or screwdriver tool can be useful. To remove the old paint or old seals, you can sand the floor. Proceed as you soak or clean the floor. For the investigation of the low points on the surface with a ruler after cleaning the plate, wherepossible. latex backing compound can be used to fill any cracks or bumps or joints, you can do so by following the manufacturer's instructions to be used for its intended use. The patch area must be dry-brushed with a stiff bristle brush or loose particles should be vacuumed or swept up. This should be done after the connection is dry. There are two ways to solve the rough terrain. The first way is to establish a new plywood sub-floor screeds. Another methodis a new, thin slab of concrete cast on the old.

The final step in the preparation of a concrete floor covering the surface with a vapor barrier or seal, which is the best for your situation? This may be suggested by the dealer floor.

No comments:

Post a Comment